跳转至内容
  • 版块
  • 标签
  • 热门
  • 用户
  • 群组
皮肤
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • 默认(Flatly)
  • 不使用皮肤
折叠

Odoo 中文社区

  1. 主页
  2. 版块
  3. Odoo 新手求助
  4. Problem with setting up Subcontracting Manaufacture

Problem with setting up Subcontracting Manaufacture

已定时 已固定 已锁定 已移动 Odoo 新手求助
6 帖子 3 发布者 8.7k 浏览
  • 从旧到新
  • 从新到旧
  • 最多赞同
登录后回复
此主题已被删除。只有拥有主题管理权限的用户可以查看。
  • C 离线
    C 离线
    clairekn
    写于 最后由 编辑
    #1

    Hi, I have a question regarding subcontracting manufacture.....

    Usually, we will send several parts to supplier and request for external engineering with formal Puchase order. Once we receive the completed parts from supplier, we will assemble the parts with other parts as further steps to complete the customer order. To make it clearer, there is sample:
    Customer orders Product A
    We need Product B and C to make 1 A;
    and we will provide suppplier product D to make a Product B firstly (a purchase order is requested)

    Therefore, in our case, how should we set up the products A-D? and how is the location/BOM/routing? I tried to follow manual but there is no internal move or Purchase order showing out.

    Any help is appreciated.

    Thanks

    1 条回复 最后回复
    0
    • wjfonhandW 离线
      wjfonhandW 离线
      wjfonhand
      写于 最后由 编辑
      #2

      哦,把D的生产库位设置为供应商库位应该就能根据mrp自动生成送货单了。
      只是采购件B下面再挂子件不太符合BOM的逻辑,不知道mrp运算会不会考虑这一点。如果算不出来可能要把bcd放在同级。
      总之,可以实现。

      GoodERP -- Odoo China fork

      1 条回复 最后回复
      0
      • C 离线
        C 离线
        clairekn
        写于 最后由 编辑
        #3

        Hi, thank you for help.

        I tried BOM, it works but there is no internal move shown as mentioned in OPENERP's user manual.that's why I try to do further.

        our company's manufacturing is a bit complicated.

        Sorry for not typing Chinese here. No Chinese typing in my office computer.

        Thanks again.

        1 条回复 最后回复
        0
        • digitalsatoriD 离线
          digitalsatoriD 离线
          digitalsatori 管理员
          写于 最后由 编辑
          #4

          Hi clairekn,

          I copy and paste below the setup process for subcontracting manufacturing in openerp from OpenERP  user manual , let us know if you are still facing problems:

          Subcontracting Manufacturing  In OpenERP it is possible to subcontract production operations (for example, painting and item  assembly) at a supplier’s. On the relevant routing document, you have to indicate a supplier  location for stock management.
          You then have to configure a location dedicated to this supplier with the following data:
          [list]
          [li][i]Location Type[/i]: Supplier,[/li]
          [li][i]Location Address[/i]: Select an address of the subcontractor partner,[/li]
          [li][i]Chained Location Type[/i]: Fixed,[/li]
          [li][i]Chained Location If Fixed[/i]: your Stock,[/li]
          [li][i]Chaining Lead Time[/i]: number of days before receipt of the finished product.[/li]
          [/list]  Once the manufacturing has been planned for the product concerned, OpenERP will generate the  following steps:
          [list]
          [li]Delivery of raw materials to the stores for the supplier,[/li]
          [li]Production order for the products at the suppliers and receipt of the finished products in the stores.[/li]
          [/list]  Once the production order has been confirmed, OpenERP automatically generates a delivery order to  send to the raw materials supplier. The storesperson can access this delivery order using the menu  [i]Warehouse ‣ Warehouse Management ‣ Internal Moves[/i]. The raw materials will then be placed in  stock at the supplier’s stores.
          Once the delivery of raw materials has been confirmed, OpenERP activates the production order. The  supplier uses the raw materials sent to produce the finished goods which will automatically be put  in your own stores. The confirmation of this manufacturing is made when you receive the products from  your supplier. At that point, you indicate the quantities consumed by your supplier.
            Tip
          Subcontract Without Routing
          If you do not use routing, you can always subcontract work orders by creating an empty routing in  the subcontract bill of materials.
            Production orders are found in the menu [i]Manufacturing ‣ Manufacturing ‣  Manufacturing Orders[/i]. A production order is always carried out in two stages:
          [list type=decimal]
          [li]Consumption of raw materials.[/li]
          [li]Production of finished products.[/li]
          [/list]  Depending on the company’s needs, you can specify that the first step is confirmed at the  acknowledgement of manufacturing supplier, and the second at the receipt of finished goods in the  warehouse

          【上海先安科技】(tony AT openerp.cn)

          1 条回复 最后回复
          0
          • C 离线
            C 离线
            clairekn
            写于 最后由 编辑
            #5

            Thank you very much.

            I think I sort of get that problem solved......

            I may have more questions later, hehe.....

            Thank you again.

            Have a good weekend. ;D

            1 条回复 最后回复
            0

            • 登录

            • 没有帐号? 注册

            • 登录或注册以进行搜索。
            • 第一个帖子
              最后一个帖子
            0
            • 版块
            • 标签
            • 热门
            • 用户
            • 群组